Composite or cedar for a deck here?expand_more
Composite if you want to stop maintaining it — the wet season makes annual sealing of cedar a chore most people quit doing. Cedar if you prefer the look and genuinely will keep up with it. Both are common on Hillsboro streets and both perform well when framed properly.
Do I need a permit for a deck?expand_more
Usually yes if it is attached to the house or raised more than a modest height above grade. A low, freestanding platform often does not require one. The builder should confirm with the City of Hillsboro or Washington County depending on your address and include the fee in the bid.
When is the best time to build?expand_more
Late spring through early fall, when the ground is workable and concrete cures properly. Crews book that window early. Winter builds happen but get delayed by rain and by clay soil that turns into a mess around the footing holes.
How long should a deck last in this climate?expand_more
Pressure-treated framing commonly holds 20 to 25 years when it can dry. Cedar decking realistically gives 12 to 18 with maintenance; composite surfaces generally last 25 or more. The ledger and the post bases usually determine the true lifespan, not the decking.
Who is responsible for a shared fence?expand_more
Oregon convention has adjoining owners share the cost of a boundary fence, but it is a conversation, not an automatic entitlement. Talk with the neighbor and get agreement in writing before work starts. Have the line confirmed if there is any doubt about where it runs.
Can I reuse the framing and replace only deck boards?expand_more
Yes when joists, beams, posts, ledger, fasteners, and footings remain sound and the spacing suits the new decking. The builder should inspect from below and document any repairs. Composite products may require tighter joist spacing than the old wood surface used.
What should the deck warranty cover?expand_more
Separate the manufacturer's material warranty from the builder's workmanship warranty. Ask how callbacks for loose rails, fasteners, drainage problems, or movement are handled and what maintenance is required to preserve coverage. Keep product names and color codes with the contract.
Should deck lighting be planned before construction?expand_more
Yes. Stair, post, and under-rail lighting is cleaner when wiring paths and transformer placement are designed before framing is closed. Decide whether electrical work is included in the deck bid or handled by a separate licensed trade so the schedule and inspection sequence stay clear.