Does solar really work in the Pacific Northwest?expand_more
Yes, though production is lower than in sunny states. Long summer days offset the grey winter, and annual output on a decent roof is enough to make the economics work with current incentives. The key is a realistic production estimate rather than an optimistic one.
How long does the whole process take?expand_more
Installation itself is usually one to three days. The full timeline from contract to switched on commonly runs two to four months once design, permitting, and utility interconnection approval are counted. Anyone promising a two-week turnaround is not accounting for the utility.
Do I need a panel upgrade to add solar or an EV charger?expand_more
Not always. It depends on your existing service size, the busbar rating, and what else is on the panel. A load calculation gives the real answer. Sometimes a load management device is a cheaper alternative to a full service upgrade.
Will solar keep my power on during an outage?expand_more
Not by itself. A standard grid-tied array shuts down during an outage for line worker safety. Backup requires a battery with the right inverter setup, which is a separate decision and a separate cost worth being explicit about up front.
What should be in a solar bid?expand_more
Panel and inverter models, total system size in kilowatts, a year-one production estimate with the shade assumptions stated, the workmanship and equipment warranties, who handles permitting and interconnection, and the net cost after credits you actually qualify for. Compare bids on dollars per watt, not on the headline total.