Inspect the base before selecting a method
Record the existing covering, substrate, flatness, cracks, movement, contamination and moisture evidence. Define what must be removed and who decides whether the exposed base can receive tile.
Tile performs only as well as the substrate, water-control system, setting materials and movement details beneath it. For an Aloha address, confirm jurisdiction with Washington County before assigning permits, identify plumbing or electrical changes separately, and make bidders price the same layout and finish boundary.
Require substrate findings, removal and preparation limits, wet-area waterproofing, exact products, approved layout, transitions and movement joints, regulated-trade responsibilities, occupied-home controls, cure time and closeout records.
Record the existing covering, substrate, flatness, cracks, movement, contamination and moisture evidence. Define what must be removed and who decides whether the exposed base can receive tile.
A shower or other wet assembly should identify slope, drain connection, membrane, seams, corners, curb, niche and every penetration. State the test and acceptance point before tile covers the waterproofing.
Use delivered tile or stone dimensions to resolve focal lines, pattern direction, grout width, edge cuts, openings and variation. Photograph the approved dry layout or sample area.
List patching, underlayment, membrane, mortar, grout, sealant and sealer by intended use. Require written approval for substitutions and follow product cure and environmental requirements.
Identify building joints, changes of plane, perimeters, thresholds and adjacent floor heights. Assign flexible-joint and edge profiles rather than leaving them to field improvisation.
Aloha includes unincorporated Washington County properties. Tile replacement differs from moving plumbing, altering framing or adding electrical work, so confirm the parcel and complete scope.
Define dust containment, debris path, fixture removal, material storage, water shutoffs, adjacent-finish protection and daily cleanup. State when the space can safely return to service.
Review alignment, joint consistency, edges, sealant, transitions and damage after required cure. Keep extra material, batch information, photos, approvals, care guidance and warranties.
Describe your project once and we help connect your request with relevant local contractors who serve your area. The request is free, there is no obligation to hire, and you decide whether anyone is right for the job.
Washington County publishes residential building resources for unincorporated properties; confirm the parcel before assigning review.
Oregon CCB consumer tools support license and complaint-history checks.
Covered renovation disturbing pre-1978 painted surfaces may fall under EPA lead-safe renovation requirements.
| Decision | Evidence before installation | Acceptance check |
|---|---|---|
| Substrate | Flatness, cracks, movement and moisture | Prepared stable surface |
| Wet area | Drain, slope, membrane and penetrations | Tested water-control system |
| Layout | Actual tile dimensions and focal lines | Approved cuts and pattern |
| Setting materials | Compatible named products | Coverage and cure records |
| Transitions | Height and edge details | Safe finished connection |
| Trade work | Plumbing, electrical or structural scope | Licensed work and approvals |
Separate investigation, demolition, preparation, waterproofing, setting materials, tile, regulated trades, protection, transitions, cure, cleanup and closeout. Keep material and concealed-condition allowances measurable and written.
Only after the existing bond, flatness, height, movement and product compatibility are assessed and accepted.
No. Wet areas need a defined water-control assembly behind or beneath the finish.
Confirm the exact property. Washington County may serve unincorporated Aloha addresses, while trade work can follow separate approval paths.
Before repetitive setting, using actual material dimensions, planned joints, focal lines and edge cuts.
Document the condition and approve a preparation or repair method before installation; do not hide it in a general allowance.
Follow the specified membrane, mortar, grout and sealant cure requirements before traffic or water exposure.
Search the exact legal business through Oregon CCB and verify regulated trades separately.
Keep extra tile, batch and product data, layout approval, photos, permits, care instructions and warranties.
Share condition photos, room dimensions, selected materials and wet-area needs for proposals based on one complete assembly.
Find Contractors100% free · No obligation · Takes about 2 minutes — only matched pros ever see your number